Built. Delivered. Standing.
Recent apartment schemes in Cork, delivered for main contractors and developers.
ResidentialOct 2025 – Feb 2026Eden, Blackrock
Blackrock, Cork
Full brickwork on one of the scheme's three apartment blocks, from October to February, for Glenveagh.
- Main contractor:
- Glenveagh
- Scope
- Brickwork
ResidentialJan 2026 – ongoingCastlelake, Carrigtwohill
Carrigtwohill, Co. Cork
Brick slips fixed to all six ICF apartment blocks on the scheme, with two more blocks to follow. Brought in after another crew's no-show had cost the contractor six weeks; the first block, programmed for six weeks, was delivered in three.
- Main contractor:
- BAM
- Scope
- Brick slips
ResidentialMay 2026Apartment block, Grange Road
Douglas, Cork
Called in during week two of a seven-week programme after the booked crew failed to appear. The block was finished in weeks four to five, almost three weeks ahead of the contractor's deadline.
- Main contractor:
- Authentic Homes
- Scope
- Brick slips